Success! Full Planning Granted for Two Commercial Buildings in North Lincolnshire

Success! Full Planning Granted for Two Commercial Buildings in North Lincolnshire

'Prism Ag' is delighted to have secured two full planning permissions for two applications which ran concurrently for commercial / industrial schemes in Scunthorpe, North Lincolnshire

    

Phase 1 is for eight starter units each with wc and small office space, we acquired Phase 1's former application post submission from another agent during the first lockdown, 'Prism Ag' achieved an initial permission then utilised the 'fallback position' and resubmitted the #major #planningapplication with the additional documents and an improved scheme which achieved a better use of the site for the clients preferred layout.

  'Phase 1'

Phase 2 was for  #minor #planningapplication for two larger industrial units with mezzanine offices on the same site in Scunthorpe, North Lincs.

   'Phase 2'

Thanks to AMATP 's Andrew Moseley for the #Highways and #Transport #Planning input and Gavin Shepherd for the Flood Risk + Drainage input, #Architectural plans for the final approved schemes by Architecture OneEight Ltd, Timothy Hyett at EarthTech Consulting Ltd for the #GeoTechnical consultancy. See post on LinkedIn